Following on from the previous post on baseboard completion (!), this time it really is done. Cross braces are fitted and drilled to allow wiring to pass through. Here's proof:
Also, here's a close-up of a leg 'pocket' - the design is a fixed leg design with the leg being held in place with a bolt (not shown). I thought this was ingenious design on my part, but found out later that it's common practice. It even featured in this month's BRM layout construction article.
Also, here's a close-up of a board end, showing the bolt hole and alignment dowel fitted.
Next step is to condition the Sundeala boards before fitting, as per the instructions...
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment